Msc1G5:Group

From ex25
Revision as of 16:09, 19 October 2015 by Veerasu (Talk | contribs)

Jump to: navigation, search


HYDROBODY TITLE.jpg


MANIFESTO

CONCEPT-01.jpg

THE FUTURE

Rotterdam in the year 2025, assuming that the seawater level continue rising in this pace where it goes beyond what the government and authority are expecting. Instead of keep continuing to invest more and more on the mechanical part, water sewage system, water treatment plant. This is not the root of the problem and sustainable solution as the problem will getting worse and worse. We should take a step back and realize what are the real problems and how can we live with this situation and how can we provide a solution for the future.

PAVILION

The water problem is becoming a significant problem for the future of Rotterdam. The Hydro-Body Pavilion will serve as a mechanism to purify the water as well as didactic role models of future passive sustainable water treatment and uses. We present a possible site near the sluice that is possible to let the water flow through the building. It will be a community hub of purification of the water, from rainfall, river, residential area, and industrial ports, as well as a public space of recreational and leisure program.


DESIGN PARAMETERS

G5 CONCEPT2.jpeg

1.ANCHORING POINT WILL MARK ENTRANCE AND EXIT This points will be generated from different actors entering the pavilion from different location. This different types of user are local people from residential area, Industrial Workers from nearby warehouses and shipping yard, Tourist from Sc commercial area

2.DIFFERENT SOURCE OF WATER = EXHIBITION CIRCULATION PATH

3.ANCHORING POINT WILL MARK ENTRANCE AND EXIT

SITE LOCATION

Hydro-body SITE2.jpeg Fortunaweg, Schiedam SITE ATMOSHPERE G5 Site image.jpg

G5 flow.gif G5 function1.gif

CURRENT PROBLEMS

water-drop as a point of swarm

1.jpg