Difference between revisions of "Msc1G5:Group"

From ex25
Jump to: navigation, search
(Drawings will be updated below)
(Drawings will be updated below)
Line 37: Line 37:
 
   |id=hydrofinal sequence=forward transition=fade refresh=2000
 
   |id=hydrofinal sequence=forward transition=fade refresh=2000
 
   }}
 
   }}
 +
 +
[[File:Hydrobody_drawings-06.jpg |212.5px]][[File:Hydrobody_drawings-06.jpg |212.5px]][[File:FINAL_SAND_TOWER_low.jpg |212.5px]][[File:Hydrobody_drawings-06.jpg |212.5px]]
  
  
 
.
 
.
 
<comments voting="Plus">
 
<comments voting="Plus">

Revision as of 04:23, 3 February 2016

HYDROBODY TITLE.jpg


Drawings will be updated below

Hydrobody drawings-05.jpg
Hydrobody drawings-04.jpg

Hydrobody drawings-03.jpgHydrobody drawings-01.jpgHydrobody drawings-06.jpg

Hydrobody drawings-07.jpg
Hydrobody drawings-08.jpg
Hydrobody drawings-09.jpg

212.5px212.5px212.5px212.5px


.


Serban Bodea

3061 days ago
Score 0

Hydro-body, These are some comments based on our last tutoring session:

Examine the societal dimension of your proposal by linking the urban and local scales and showing how your proposal is adapted to each. There are clear scientific principles that make your building perform, take them into account from a design point of view. Identify the inputs and outputs of your system and integrate the spatial qualities associated to each into a complete user experience.Develop a detailed 3D model that incorporates all the qualities you aim for.

You are not allowed to post comments.